The new beach between the Pyramids and Coffee Cup at Eastney was completed in late December 2025 and has already been tested by several storms throughout January, including Storm Ingrid over the weekend. So, how is it performing so far?
The beach has been performing just as expected, absorbing the large waves, and protecting the promenade and road from being flooded and covered in shingle (see photos below for how the road and prom used to look).
Photos: Shingle over the road and promenade and damage to the seawall following a storm in November 2023.
Did you know, the beach has been built to be 3.5 times wider than it needs to be today, so that it can be sustained for its design life over the next 100 years? The beach plays an important role in taking energy out of the waves. This is so that the hard defences, which are still to be constructed here, are smaller and lower in height, enabling us to preserve the views we have today. The design of the beach has been based on many years of coastal monitoring and modelling and understanding of the local coastal processes and is designed to be a managed beach.
What does this mean? As a managed beach, it is expected that the beach will move around and change shape. From a first glance, it may look as though material from the beach has been lost, but this is not the case; it has just settled lower down the beach. This is a natural process and you will be able to continuously see the crest width of the beach increase and decrease.
Throughout the winter season, where tidal conditions are generally more turbulent, large waves which break on the beach, mobilise the beach material in the water. This results in material being dragged lower down on the beach, giving the appearance of a smaller width beach. During the summer season, where tidal conditions are calmer, waves push this material that has settled lower down the beach, back up to the top of the beach, giving the appearance of a wider beach. See diagram below which describes this process.
Diagram: Describes how the material on a beach, changes during winter and summer seasons. Credit: Steven Earle, “Physical Geology”, another open textbook – open textbook, CC BY-SA 4.0.
You will be able to see that along the front of the new beach there are sections of ‘cliffing’ which have formed resulting in a small drop on the beach (see photos below). Again, this is expected and happens where the newly placed material is being naturally sorted.
The material placed on the beach has been dredged from a licenced offshore marine site just off the Isle of Wight, so the large and small particles are all mixed. Over each tidal cycle, the waves, whether large or small, help to sort the material across the beach profile, with larger material at the top of the beach and smaller material lower down. This process of sorting will take some time before the beach finds its new, natural equilibrium.
The sections of ‘cliffing’ we have on the beach are small and access currently remains good up and down the beach, but we will continue to monitor. We could bring machinery back to the beach to remove the cliffing; however if we do go back, we will be remixing the material which is being sorted naturally and this will result in repeated cliffing and elongate the natural sorting process, so it is best to leave it and let nature take its course.
Photos: Condition of the new beach today (26/01/26) west (top) and east (middle) of South Parade Pier. Small section of cliffing present west of the Coffee Cup, Eastney (bottom).
We have a team on site who are continuing to closely monitor the performance of the beach as part of our beach management plan. Frequent surveys are carried out and the data analysed, which all helps to build a more detailed picture of how our beaches operate and perform during different conditions. The monitoring will continue to happen over the lifetime of the beach. And, yes, we will be monitoring the beach following the anticipated Storm Chandra tomorrow, which could see further movements of the beach material.
To recap:
- The new beach has been performing just as expected, despite being tested by the recent storms.
- The beach is designed to change shape and move around throughout the year.
- The beach is continuing to naturally sort itself which has resulted in some cliffing appearing, but this is nothing to be concerned of and will disappear over time.
- We will continue to closely monitor the beach.